Toledo Metro Parks Trail East
Toledo Metro Parks
Toledo, OH
Fabricate and install 348' guardrail, 222' guard rail no infill panel, as well as the unload, assemble, and erection of the 101k lb pedestrian bridge being set into place with a 550-ton crane. Ironworkers Local 55 had to swing this 110' long bridge around for the Toledo Metro Parks Trail East.
Watch the time lapse video HERE
- General Contractor
- Mosser Construction
- Application
- Steel Fabrication, Misc. Metals
- Project Status
- Completed